A P-13 water well is a former oil or gas well converted for freshwater production through a process administered by the Railroad Commission of Texas (RRC). The arrangement can serve both the operator and the landowner: the operator avoids some of the expense of plugging the entire well, and the landowner obtains a comparatively inexpensive






